Sibelco Nordic Oy Ab belongs to the international Sibelco Group which was founded in 1872 and is today a global material solutions company. Sibelco mines, processes and sells industrial minerals at locations worldwide, focused primarily on silica, clays, feldspathics and olivine. It is also a leader in glass recycling. The Sibelco Group operates over 110 production sites in 31 countries, with a team of over 5,000 people.

The company’s vision includes focus on safety, sustainability and CO2 reduction. Sibelco’s activities can have both positive and negative impacts on the environment and society. It is essential that we proactively manage these impacts in line with the changing expectations of stakeholders and upcoming legislation.

In Finland Sibelco Nordic operates in Kemiönsaari, Nilsiä and Karvia. The quarries are located in Kemiönsaari and Nilsiä.

Kemiö (Kimito) plant manufactures feldspar and quartz products from local pegmatite sources (three quarries) and processes silica sand from Dessel, Belgium and anorthosite (Ca-feldspar) from eastern Finland.

Main applications for products are sanitary ware ceramics, fiberglass and foundries.

Nilsiä has two quarries and the plant manufactures quartz products which are used in water filtration, glass industry, sport applications and foundries.

 

TSM-tulokset ovat saatavilla todentamisen jälkeen.

Social Responsibility Report

Company in figures

  • Production volume: Kemiö 65268 t, Nilsiä 40806 t
  • Total mining: Kemiö 88572 t, Nilsiä 32345 t
  • Reported one reserves: Not reported publicly.
  • Reported mineral reserves: Not reported publicly.
  • Year of commencement: Kemiö 1966, Sibelco ownership from 1999, small scale pegmatite quarrying in Kemiö since 17th century. Nilsiä 1976, Sibelco ownership from 1999, Kinahmi quarry in use since 1914.
  • Expected remaining life of the mine: Kemiö more than 50 years, Nilsiä more than 100 years.
  • Mining area: Kemiö 120 ha, Nilsiä 147,5 ha.
  • Number of own employees (31.12.): 60
  • The main localities of the employees: Kemiönsaari 48,3 %, Kuopio 21,7 % and Karvia, Salo and Turku 5 %.
  • Number of permanent contractors (31.12.): Depending on the time of the year 10-20 contractors.
  • Operating profit EBITDA: Not reported publicly.
  • Paid capital gains tax: Not reported publicly.

Information about prospecting

Sibelco Nordic had no exploration in Finland.

  • Number and area of reservation areas: 0
  • Number and area of exploration permit areas: 0
  • Number and area of exploration permit application: 0
  • Exploration permits under appeal: 0
  • Exploration drilling: 0

Surroundings

The company's environmental practices:
Yes No
Location in a nature reserve*
Environmental Management System **
Environmental impact assessment required (in accordance with the EIA Act) *
Measurements for dust
Measurements for noise
Measurements for vibration
Environmental risk assessment carried out
Deviations from environmental permits ***
Closure plan for the mine
Plan for the controlled shutdown of the mine in unexpected situations
  • ** ISO 14001, certified.

  • Environmental permit granted: Yes
  • Year of permit: Kemiö 2016, Nilsiä 2012
  • Link of permit: Kemiö: https://ylupa.avi.fi/fi-FI/asia/1222466
  • Guarantee in accordance with the Environmental Protection Act: Kemiö 200 000 e, Nilsiä 330 000 e
  • Financial guarantee in accordance with the mining act in the mining permit area: Kemiö 36 000 e, Nilsiä 30 000 e
  • Financial guarantee in accordance with the mining act in mineral exploration permit area: Sibelco Nordic Oy had no mineral exploration in Finland.

Key Figures

  • Amount of mining waste: Kemiö: 25951,7 t wet tailings (64,5%), 14304 t dry tailings (35,5%), Nilsiä 10 809 t wet tailings, no dry tailings.
  • Utilixation of extractive waste: Kemiö: sold 40898 t (74%), own use 14135 t (26%).
  • Fuel Consumption: Kemiö 0,2 GWh, Nilsiä 0,5 GWh (Just Sibelco's fuel consumption.)
  • Other energy consumption: Kemiö electricity 6,6 GWh and LNG 5,7 GWh, Nilsiä electricity 1,6 GWh and LNG 1,3 GWh.
  • Energy consumption target: 2023 the target was not reached: target in total 15,4 GWh, result 15,8 GWh
  • CO2 emissions from the mine: Kemiö 1,83 kt, Nilsiä 0,53 kt (scope-2)
  • Water consumption: Kemiö 2,3 Mm3 (raw water 5%), Nilsiä 0,4 Mm3 (raw water in the process 0%)
  • Discharge of water outside the mining area: Kemiö: 0,255 Mm3, Nilsiä 0,07 Mm3
  • Number of dams in the mining area: Kemiö 2, Nilsiä 2
  • Endangered species are present in the operational area: No
  • Use of environmentally hazardous chemicals: Kemiö 71.2 t, Nilsiä 21.1 t
  • Biodiversity actions: Biodiversity mapping was done at Sibelco's Nilsiä site in autumn 2022. The results give good input for further actions and also in the work to restrictn spreading of invasive species such as Himalayan balsam. In Kemiö nature and species mapping was done in summer 2023 on two glacial till extraction sites. One of the areas will be restored in 2025 based on the findings in the mapping.

Personnel and security

The company's personnel practices:
Yes No
Staff initiative system
Performance appraisals concerning the entire personnel
Staff training plan
Equality plan
Employee representation in company administration
Occupational health and safety management system*
Occupational safety card for everyone working in the area
Own rescue unit
  • * ISO 45001:2018, certified.

Key Figures

  • Average training days: Approximately 1.5
  • Sickness absences (excluding contractors): Not reported publicly.
  • Accident frequency: RIR 8,35
  • Shift systems in use: Day shift - 5 days a week, 3 shift - 5 days a week, 3 shift - 6 days a week, 3 shift - 7 days a week at 7,5 h, 8 h, 12 h or flexible working hours.
  • Share of women in the labour force: 33,3

Impact on the use and livelihoods of nearby areas

Impact on local livelihoods:

Operations at Sibelco sites employ directly and indirectly both local people and companies. One impact of Sibelco for example in Kemiö is the development of some of the forest roads in the area and this has been positive for the local land and forest owners.

In Nilsiä Sibelco participated in the Lake Kauppinen restoration project. The project had as goal to improve the lake’s status and provide better opportunities for recreation.  Sibelco has also installed equipment for continous oxidation in the lake to prevent salinity layering.

Impact on nearby recreational use:

Sibelco Nordic has small impact on the recreational use . The sites are relatively remote and due to safety regulations the areas are closed for public. Operational hours are determined in the environmental permits and for example in Kemiö the operational hours of the quarry are restricted in summer in order to minimize any disturbance it might have caused for vacationers in the area.

Impact on landscape value:

All Sibelco sites have a comprehensive closure plan which includes also a restoration plan. The goal is to progressive restoration in the areas where it is possible. The plans are made in co-operation with the landowners and the authorities.

Interaction with stakeholders

Stakeholder cooperation:

The company has performed a stakeholder analysis and has a stakeholder engagement and communication plan for each site.

Research and cooperation projects:

Sibelco Nordic participates in several research and collaboration projects which focus on developing alternatives for the use of tailings, other waste streams or by-products in order to promote the transition towards circularity.

Social Responsibility Report
Area of operation
Finland (Kemiönsaari, Nilsiä)
Contact information:
Jukka Toivonen
Country Manager
Sibelco Nordic Oy Ab

Other Years

No related posts found.

The Mines

Towards Sustainable Mining – TSM Suomi